Sambhv Steel Tubes Limited, founded in 2017, has continuously expanded its product range from sponge iron to value-added steel products, including ERW pipes, GI pipes, and structural tubes. Located in Raipur, Chhattisgarh, the company benefits from close proximity to key raw material suppliers and operates India’s only single location fully backward-integrated ERW steel pipe facility. This integration ensures cost efficiency and quality control. With innovations like narrow-width HR coils and a captive power plant for sustainable operations, Sambhv serves 16 states with over 600 dealers, playing a key role in India’s infrastructure growth.
- Increased the installed capacity of sponge iron to 280,000 MTPA
- Increased the installed capacity of HR coil to 390,000 MTPA
- Allocated the installed capacity of blooms/slabs for mild steel to 300,000 MTPA
- Increased the installed capacity of ERW and GI pipes to 350,000 MTPA
- Increased installed capacity of captive power plant to 25 MW
- Commenced manufacturing stainless steel blooms/slabs with installed capacity of 60,000 MTPA
- Commenced manufacturing stainless steel HR coil with installed capacity of 60,000 MTPA
- Increased the installed capacity of blooms/slabs to 317,400 MTPA
- Commenced manufacturing GI pipes
- Commissioning of dedicated 132 KvA power line
- Increased the installed capacity of sponge iron to 105,000 MTPA
- Increased the installed capacity of blooms/slabs to 231,000 MTPA
- Increased the installed capacity of HR coils to 350,000 MTPA
- Installed capacity of 100,000 MTPA to manufacture CR coil
- Commenced manufacturing ERW pipes with installed capacity of 150,000 MTPA
- Increased the installed capacity of ERW pipes to 250,000 MTPA
- Increased the installed capacity of blooms/slabs to 150,000 MTPA
- Commenced manufacturing HR coils with installed capacity of 150,000 MT
- Increased the installed capacity of blooms/slabs to 150,000 MTPA
- Commenced manufacturing HR coils with installed capacity of 150,000 MT
Increased the sponge iron installed capacity to 90,000 MTPA.
Acquired the Sarora (Tilda) Facility and commenced manufacturing sponge iron with installed capacity of 60,000 MTPA
- Increased the installed capacity of sponge iron to 280,000 MTPA
- Increased the installed capacity of HR coil to 390,000 MTPA
- Allocated the installed capacity of blooms/slabs for mild steel to 300,000 MTPA
- Increased the installed capacity of ERW and GI pipes to 350,000 MTPA
- Increased installed capacity of captive power plant to 25 MW
- Commenced manufacturing stainless steel blooms/slabs with installed capacity of 60,000 MTPA
- Commenced manufacturing stainless steel HR coil with installed capacity of 60,000 MTPA
- Increased the installed capacity of blooms/slabs to 317,400 MTPA
- Commenced manufacturing GI pipes
- Commissioning of dedicated 132 KvA power line
- Increased the installed capacity of sponge iron to 105,000 MTPA
- Increased the installed capacity of blooms/slabs to 231,000 MTPA
- Increased the installed capacity of HR coils to 350,000 MTPA
- Installed capacity of 100,000 MTPA to manufacture CR coil
- Commenced manufacturing ERW pipes with installed capacity of 150,000 MTPA
- Increased the installed capacity of ERW pipes to 250,000 MTPA
- Increased the installed capacity of blooms/slabs to 150,000 MTPA
- Commenced manufacturing HR coils with installed capacity of 150,000 MT
- Increased the installed capacity of blooms/slabs to 150,000 MTPA
- Commenced manufacturing HR coils with installed capacity of 150,000 MT
Increased the sponge iron installed capacity to 90,000 MTPA.
Acquired the Sarora (Tilda) Facility and commenced manufacturing sponge iron with installed capacity of 60,000 MTPA
As we continue to grow and evolve, we remain committed to delivering high-quality products and services to our customers, driven by our vision of excellence in the steel manufacturing sector.